HERBOLD Meckesheim has just started rebuilding the site destroyed by the devastating blaze

After the devastating fire in September 2018, HERBOLD Meckesheim has just begun rebuilding the destroyed production halls. The whole incoming goods and shipping department, the warehouse as well as parts of the production area were devastated by the flames. The new buildings comprise a 4000 M2-area and are supposed to be up and running in Read more about HERBOLD Meckesheim has just started rebuilding the site destroyed by the devastating blaze[…]

Industrial switches for high-availability networks

Switches serve as pilots of data traffic in Ethernet networks. At SPS IPC Drives 2017 in Nuremberg, Lapp is presenting its own models for the first time under the name ETHERLINE® ACCESS. Their performance characteristics are impressive, even to demanding users in industry. Accordingly, the critical reconfiguration time needed for communication to be re-established after Read more about Industrial switches for high-availability networks[…]